v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed
in the Action column until the problem is resolved.
v See Chapter 3, "Parts listing, Types 7988 and 8844," on page 137 to determine which components are
CRUs and which components are FRUs.
v If an action step is preceded by "(Trained service technician only)," that step must be performed only by a
trained service technician.
Progress code
CA00E142
CA00E143
CA00E149
CA00E14C
CA00E14D
CA00E150
CA00E151
CA00E152
CA00E153
CA00E154
CA00E155
24
BladeCenter JS21 Types 7988 and 8844: Problem Determination and Service Guide
Description
The management module bootlist is
being set from the operating system
bootlist.
The operating system bootlist is being
set from the management module
bootlist.
Create boot manager node
Create terminal emulator node
Load boot image
Create host (primary) node
Probing PCI bus
Probing for adapter FCODE; evaluate if
present
End adapter FCODE probing and
evaluation
Create PCI bridge node
Probing PCI bridge secondary bus
Action
1. Reboot the blade server.
2. Check for server firmware updates; apply if
available.
3. Go to "Checkout procedure" on page 106.
4. Replace the system board and chassis
assembly.
1. Reboot the blade server.
2. Check for server firmware updates; apply if
available.
3. Go to "Checkout procedure" on page 106.
4. Replace the system board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
Go to "Boot problem resolution" on page 112.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.