IBM BladeCenter JS21 Types 8844 Service Manual page 32

Problem determination and service guide
Hide thumbs Also See for BladeCenter JS21 Types 8844:
Table of Contents

Advertisement

v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed
in the Action column until the problem is resolved.
v See Chapter 3, "Parts listing, Types 7988 and 8844," on page 137 to determine which components are
CRUs and which components are FRUs.
v If an action step is preceded by "(Trained service technician only)," that step must be performed only by a
trained service technician.
Progress code
C2008110
C2008120
C2008130
C2008138
C200813F
C20081FF
C2008200
C20082FF
C400E200
C400E201
C400E202
16
BladeCenter JS21 Types 7988 and 8844: Problem Determination and Service Guide
Description
Initializing event paths
Starting processor(s)
Begin associate of system ports
Associating system ports to the partition
End associate of system ports
Processors started successfully, now
waiting to receive the continue
acknowledgement from system firmware
Continue acknowledgement received
from system firmware
VSP startup complete successfully
U4 I2C Master interface Initialization
Flash RAM CRC checksum is valid
MPIC initialization
Action
1. Go to "Recovering the system firmware" on
page 127.
2. Replace the system-board and chassis
assembly.
1. Go to "Recovering the system firmware" on
page 127.
2. Replace the system-board and chassis
assembly.
1. Go to "Recovering the system firmware" on
page 127.
2. Replace the system-board and chassis
assembly.
1. Go to "Recovering the system firmware" on
page 127.
2. Replace the system-board and chassis
assembly.
1. Go to "Recovering the system firmware" on
page 127.
2. Replace the system-board and chassis
assembly.
1. Go to "Recovering the system firmware" on
page 127.
2. Replace the system-board and chassis
assembly.
1. Go to "Recovering the system firmware" on
page 127.
2. Replace the system-board and chassis
assembly.
1. Go to "Recovering the system firmware" on
page 127.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.
1. Go to "Checkout procedure" on page 106.
2. Replace the system-board and chassis
assembly.

Advertisement

Table of Contents
loading

Table of Contents