11. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
12. Power up the server.
Results
Results
The installation is complete.
Cabling
Cabling
This chapter includes cabling guidelines and diagrams for internal component cabling.
Subtopics
Subtopics

Cabling guidelines

Cabling guidelines
Cabling diagrams
Cabling diagrams
Internal cabling management
Internal cabling management
Storage cabling
Storage cabling
Optical drive cabling
Optical drive cabling
HPE NS204i-u Boot Device cabling
HPE NS204i-u Boot Device cabling
M.2 SSD pass-through card cabling
M.2 SSD pass-through card cabling
Accelerator cabling
Accelerator cabling
Pump signal cabling for the liquid cooling heatsink
Pump signal cabling for the liquid cooling heatsink
OCP bandwidth upgrade cabling
OCP bandwidth upgrade cabling
Serial port cabling
Serial port cabling
Chassis intrusion detection switch cabling
Chassis intrusion detection switch cabling
Front I/O cabling
Front I/O cabling
Front USB and DisplayPort cabling
Front USB and DisplayPort cabling
Cabling guidelines
Cabling guidelines
Observe the following:
Some diagrams show alphabetical callouts A, B, C, etc. These callouts correspond to labels near the connectors on the cable.
The cable colors in the cabling diagrams used in this chapter are for illustration purposes only.
Observe all guidelines when working with server cables.
Before connecting cables
Before connecting cables
Note the port labels on the PCA components. Not all these components are used by all servers:
System board ports
HPE ProLiant DL325 Gen11 Server User Guide
186

Advertisement

Table of Contents
loading

Table of Contents