HPE ProLiant DL325 Gen11 User Manual page 125

Hide thumbs Also See for ProLiant DL325 Gen11:
Table of Contents

Advertisement

The riser cage is aligned with the rear chassis.
The riser board is firmly seated on the system board.
b. Simultaneously push and rotate the half-turn spring latch to 180°.
c. Close the spring latch.
10. Install the access panel .
11. Install the server into the rack.
12. Connect all peripheral cables to the server.
13. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
14. Power up the server.
Results
Results
The installation is complete.
Installing the NS204i-u + secondary low-profile riser cage
Installing the NS204i-u + secondary low-profile riser cage
About this task
About this task
CAUTION:
CAUTION:
To prevent damage to electrical components, properly ground the server before beginning any installation, removal, or
replacement procedure. Improper grounding can cause electrostatic discharge.
Procedure
Procedure
HPE ProLiant DL325 Gen11 Server User Guide
125

Advertisement

Table of Contents
loading

Table of Contents