HPE ProLiant DL325 Gen11 User Manual page 142

Hide thumbs Also See for ProLiant DL325 Gen11:
Table of Contents

Advertisement

CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
CAUTION:
sensitive devices. To prevent damage, observe antistatic precautions.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack.
5. Place the server on a flat, level work surface.
6. Remove the access panel .
7. Remove the riser cage.
8. Remove the riser slot blank.
Retain the screw and blank. The screw will be used to secure the new expansion card.
9. Make sure that any switches or jumpers on the expansion card are set properly.
For more information, see the documentation that ships with the expansion card option.
10. Install the expansion card:
Make sure that the expansion card is seated firmly in the slot.
HPE ProLiant DL325 Gen11 Server User Guide
142

Advertisement

Table of Contents
loading

Table of Contents