HPE ProLiant DL325 Gen11 User Manual page 136

Hide thumbs Also See for ProLiant DL325 Gen11:
Table of Contents

Advertisement

3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack.
5. Place the server on a flat, level work surface.
6. Remove the access panel .
7. Install the energy pack in the holder located on the left side of the chassis.
a. Insert the energy pack at an angle.
b. Push the energy pack down from other end.
Make sure that the energy pack is locked in the holder.
c. Connect the energy pack cable.
8. Connect the storage backup power cable .
9. Install the access panel .
10. Install the server into the rack.
11. Connect all peripheral cables to the server.
12. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
13. Power up the server.
Results
Results
The installation is complete.
Installing an energy pack in configurations with the M.2 SSD pass-through card
Installing an energy pack in configurations with the M.2 SSD pass-through card
HPE ProLiant DL325 Gen11 Server User Guide
136

Advertisement

Table of Contents
loading

Table of Contents