Storage controller cables
Drive power cable
14. Install the middle cover .
15. Install the access panel .
16. Install the server into the rack.
17. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
18. Power up the server.
19. Install the E3.S drive.
20. Install the front bezel .
Results
Results
The installation is complete.
Installing an 8 SFF drive backplane option
Installing an 8 SFF drive backplane option
About this task
About this task
This server supports several 8 SFF NVMe drive cage options with different backplanes.
8 SFF 16G x4 U.2 NVMe / SAS UBM4 BC
8 SFF 24G x1 U.3 NVMe / SAS UBM3 BC
8 SFF 24G x4 U.3 NVMe / SAS UBM3 BC
8 SFF 24G x1 U.3 NVMe / SAS UBM6 BC
8 SFF 24G x4 U.3 NVMe / SAS UBM6 BC
For more information on the drive backplane description, see Drive backplane naming convention .
CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
CAUTION:
sensitive devices. To prevent damage, observe antistatic precautions.
Procedure
Procedure
1. Back up all server data.
2. If installed, remove the front bezel .
3. Power down the server.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Disconnect all peripheral cables from the server.
6. Remove the server from the rack.
7. Place the server on a flat, level work surface.