22. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
23. Power up the server.
Results
Results
The installation is complete.
Installing an accelerator in the primary riser cage
Installing an accelerator in the primary riser cage
Prerequisites
Prerequisites
When installing a full-length accelerator, the card retainer option is required .
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
T-15 Torx screwdriver
About this task
About this task
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all PCIe slots have either a
CAUTION:
riser slot blank or an expansion card installed.
CAUTION:
CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
sensitive devices. To prevent damage, observe antistatic precautions.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack.
5. Place the server on a flat, level work surface.
6. Remove the access panel .
7. Install the accelerator holder .
8. Remove the riser slot blank.