HPE ProLiant DL325 Gen11 User Manual page 70

Hide thumbs Also See for ProLiant DL325 Gen11:
Table of Contents

Advertisement

Server configuration
Server configuration
SFF drive
LFF/E3.S drive
Accelerator-optimized
Subtopics
Subtopics
Installing the friction rack rail
Installing the friction rack rail
Installing the friction rack rail
Installing the friction rack rail
Prerequisites
Prerequisites
Make sure that the rack rail option is compatible with the server configuration.
Small slotted screwdriver—This tool is required if you are intended to install the server in a threaded round-hole rack.
Procedure
Procedure
1. Attach the inner rails to the server:
a. Insert the spools on the sides of the server through the keyed slots on the rails.
b. Slide the rail towards the rear panel to lock it into place.
2. Locate the orientation markers on the mounting rails.
The front end of the rails is marked as FRONT LEFT
Rack rail option
Rack rail option
Rail option #2
(P52351-B21)
Rail option #3
(P52341-B21)
Rail option #7
(P52339-B21)
FRONT LEFT or FRONT RIGHT
Minimum rail length
Minimum rail length
714.32 mm (28.12 in)
787.55 mm (30.00 in)
852.91 mm (33.58 in)
FRONT RIGHT.
HPE ProLiant DL325 Gen11 Server User Guide
Adjustable rail range
Adjustable rail range
609.60 mm to 918.10 mm (24.00
in to 36.15 in)
70

Advertisement

Table of Contents
loading

Table of Contents