6. Determine the status of the drive from the drive LED definition .
7. Install the front bezel .
8. To configure drive arrays, see the relevant storage controller guide .
Results
Results
The installation is complete.
Installing an E3.S
Installing an
E3.S drive
drive
About this task
About this task
CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
CAUTION:
sensitive devices. To prevent damage, observe antistatic precautions.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are populated with
CAUTION:
either a component or a blank.
Procedure
Procedure
1. Back up all server data.
2. If installed, remove the front bezel .
3. Remove the drive blank.
Retain the blank for future use.
4. Prepare the drive.
HPE ProLiant DL325 Gen11 Server User Guide
96