The riser cage is aligned with the rear chassis.
The riser board is firmly seated on the system board.
b. Simultaneously push and rotate the half-turn spring latch to 180° (callout 2).
c. Close the spring latch (callout 3).
11. Install the access panel .
12. Install the server into the rack.
13. Connect all peripheral cables to the server.
14. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
15. Power up the server.
Results
Results
The installation is complete.
M.2 SSD pass-through card option
M.2 SSD pass-through card option
Install the dual-slot M.2 SSD pass-through card to support SATA or NVMe SSDs in 2280 or 22110 form factors .
Mixed SSD type installation is not supported.
Software RAID for NVMe SSDs is not supported.
Subtopics
Subtopics
M.2 SSD pass-through card components
M.2 SSD pass-through card components
Installing the M.2 SSD pass-through card
Installing the M.2 SSD pass-through card
HPE ProLiant DL325 Gen11 Server User Guide
164

Advertisement