12. Connect the optical drive cable .
13. Install the middle cover .
14. Install the access panel .
15. Install the server into the rack.
16. Connect all peripheral cables to the server.
17. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
18. Power up the server.
19. Install the front bezel .
Results
Results
The installation is complete.
Installing the optical drive in the SFF drive chassis
Installing the optical drive in the SFF drive chassis
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
Optical drive cage assembly (P56654-B21)
T-10 Torx screwdriver
Phillips No. 1 screwdriver
Spudger or any small prying tool
About this task
About this task
HPE ProLiant DL325 Gen11 Server User Guide
112