14. Connect all necessary internal cabling to the expansion card. For more information on these cabling requirements, see the
documentation that ships with the option.
15. Install the NS204i-u + secondary low-profile riser cage.
16. Install the access panel .
17. Install the server into the rack.
18. Connect all peripheral cables to the server.
19. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
HPE ProLiant DL325 Gen11 Server User Guide
147