Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack.
5. Place the server on a flat, level work surface.
6. Remove the access panel .
7. Remove the secondary riser cage blank.
8. Remove the default secondary riser cage bracket.
Retain the screws and bracket. These screws will be used to secure the new NS204i-u + secondary low-profile riser cage bracket.
HPE ProLiant DL325 Gen11 Server User Guide
126