22. Install the fan wall.
23. Connect following cables to the new 8 SFF drive backplane:
Storage controller cables
Drive power cable
24. Install the middle cover .
25. Install the access panel .
26. Install the server into the rack.
27. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
28. Power up the server.
29. Install the SAS, SATA, or U.3 NVMe drives .
HPE ProLiant DL325 Gen11 Server User Guide
109