11. If removed, do one of the following:
Install the primary riser cage.
Install the secondary riser cage.
Install the secondary riser cage blank.
12. Install the access panel .
13. Install the server into the rack.
14. Connect all peripheral cables to the server.
15. Connect the power cords:
a. Connect each power cord to the server.
HPE ProLiant DL325 Gen11 Server User Guide
174