Prerequisites
Prerequisites
Get help to lift and stabilize the server during removal from the rack. If the
person might be required to help remove the server
person might be required to help remove the
the rack.
Before you perform this procedure, review the:
Rack warnings and cautions
Server warnings and cautions
A fully populated server is heavy. Hewlett Packard Enterprise recommends removing the external chassis components before removing
the server from the rack.
Procedure
Procedure
1. Power down the server.
2. If installed, open the cable management arm .
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Fully extend the server out of the rack .
6. Slide the server completely out of the rack.
If the server
server: : One person to support the server weight, and the other to slide the server out of
HPE ProLiant DL320 Gen11 Server Maintenance and Service Guide
server is installed higher than chest level, an additional
is installed higher than chest level, an additional
51

Advertisement

Table of Contents
loading

Table of Contents