This device must be installed and used only in compliance with the standards listed in addition
to VDE 0113, EN 60204 (IEC 204), and applicable requirements.
For more information, refer to the letter of conformance (US) or declaration of conformity
(EU) accompanying the product.

Installation Requirements

Operating and maintenance personnel must receive proper training before installing,
troubleshooting, or maintaining high-energy electrical equipment. Potentially lethal
voltages could cause death, serious personal injury, or damage to the equipment.
Ensure that all appropriate safety precautions are taken.

Conditions of Use

To be in compliance with the stated directives and standards, you must meet the following
conditions of use.
• This device must be used in an overvoltage category II installation only.
• Before making any other connection, connect the auxiliary protective earth ground
conductor on the rear panel.
• Use only a shielded cable on the input power connector.
• Use only a shielded power cable on the output power connector.
• Non-standard connectors for input and/or output power must be inaccessible to the user.
• Install and operate this device only in a pollution degree 2 or better environment,
which means an indoor location such as a computer room, office, or factory floor
where only non-conductive pollution occurs during operation. Occasionally, a
temporary conductivity caused by condensation occurs when the device is not
operating.
• If your unit does not have a circuit breaker, install and operate it with an AE-approved
circuit breaker on the ac input to provide the required over-current protection.