5 on page 5-13). You will use P1 and P2 to connect a master unit to a slave unit and a slave
unit to another slave unit. The card also includes a Master / Slave switch. You will use this
switch to indicate whether the supply is functioning as master / stand-alone or slave.

Figure 5-5. Pinnacle master/slave interface

CONFIGURING YOUR MASTER UNIT

To configure the master unit, follow these four steps (see Figure 5-6 on page 5-14):
1. Remove all input power from the master and slave units.
2. Set the Master / Slave switch in the "up" (MSTR) position.
3. Connect the included interface cable between port P1 (the MSTR port) on the master unit
and port P2 (the SLV port) on the first slave unit.
Note: Your master unit will not have an interface cable connected to port P2.)
4. Use the grounding strap provided to connect an equi-potential ground stud on the master
unit to an equi-potential ground stud on the first slave unit.
If you want to configure your master unit as a stand-alone unit, do the following:
1. Set the Master / Slave switch in the "up" (MSTR) position.
2. Remove all Master / Slave interface cables from the master unit.

CONFIGURING YOUR SLAVE UNITS

To configure a slave unit, do the following (see Figure 5-6 on page 5-14):
1. Remove input power from the master and slave units.
2. If the Pinnacle supply includes a User card, ensure that the interlock inputs are satisfied.
Refer to the "I/O Communication and Control" chapter for specific User port pin
descriptions and required voltage levels.
3. Set the Master / Slave switch in the "down" (SLV) position.
4. Connect the included interface cable between port P1 on the first slave unit and port P2 on
the next slave unit. Continue cabling slave units together in this daisy-chain manner.
Note: The last slave unit on your system will not have an interface cable connected to
5702199-A
Page 141 of 182
port P1.
Installation
Pinnacle™ 20 kW
5-13