Connecting For Master/Slave - Advanced Energy Pinnacle 20 kW Manual

Table of Contents

Advertisement

Advanced Energy
Optimal output connection using triax cable

Connecting for Master/Slave

The Pinnacle design lets you configure up to six Pinnacle supplies as a master/slave system.
Any Pinnacle unit that features the master/slave Host card (see Figure 5-5 on page 5-13) can
function as either a master unit or a slave unit. Pinnacle units without the master/slave Host
card cannot function as a master or slave.
The master/slave card is located near the top right side of the unit's rear panel. It includes three
ports: a 9-pin, male, subminiature-D serial communications port for external control, and two
modular ports (P1 and P2) for interfacing master and slave units in a daisy chain (see Figure 5-
5-12
Page 140 of 182
®
Installation
5702199-A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents