Installing Small System Controller and Fiber Receiver cards
Figure 78
Cable Routing Guide under main cabinet
Procedure 21
Installing the 100BaseF IP daughterboard on the SSC card on the main
cabinet or chassis
1
Put on the antistatic wrist strap.
2
Place the SSC card on a clean flat surface.
3
Remove protective plugs from the connectors on the daughterboard.
4
Insert the A0817052 MT-RJ to ST cable end into the daughterboard
connector. See Figure 80 on
Repeat step 4 if a second fiber connection is required.
Cable Routing Guide
page 202
for identification of cable ends.
Small System
Installation and Configuration
Page 199 of 562