NTAK76 battery unit installation

553-3011-210
Standard 1.00
Installing and connecting reserve power supplies for the Cabinet system
Figure 65
Cable connections
Connection on power
supply unit
Cable from reserve power
Follow Procedure 17 on
the procedure for each system cabinet being installed.
Note: The system external ground must be installed before installing the
battery backup unit.
October 2003
page 179
to install an NTAK76 battery unit. Repeat