Nortel Meridian 1 Succession 1000M Installation And Configuration Manual page 197

Small system
Hide thumbs Also See for Meridian 1 Succession 1000M:
Table of Contents

Advertisement

Installing Small System Controller and Fiber Receiver cards
Figure 76
EMC grounding clip for the cabinet
Note: The EMC grounding clip is installed on the front of the stiffener
rail on the IP cabinet. There is a small #4-40 screw to fasten the clip to
the stiffener rail. The 100BaseT cable is then fed through and secured in
the clip.
Stiffener rail
EMC grounding
clip
Small System
Page 197 of 562
Installation and Configuration

Advertisement

Table of Contents
loading

Table of Contents