MacDon R113 Operator's Manual page 69

Sp disc header
Table of Contents

Advertisement

NOTE:
If not prompted by the HPT to remove float, remove float manually.
14. Lower the header to the ground.
Self-aligning center-link:
15. Use HEADER TILT cylinder switches (A) on GSL to
release load on center-link cylinder.
16. Operate the link lift cylinder with the REEL UP
switch (B) to disengage the center-link from the header.
Non-self-aligning center-link:
17. Shut off the engine and remove the key.
18. Lift hook release (A) and lift hook (B) off header pin.
CAUTION
Check to be sure all bystanders have cleared the area.
19. Start the engine.
214077
OPERATION
A
Figure 3.80: GSL
Figure 3.81: Hydraulic Center-Link
57
B
A
B
Revision A

Advertisement

Table of Contents
loading

Table of Contents