Worldwide Construction And Forestry Division 380GLC Operator's Manual page 232

Table of Contents

Advertisement

Swing Power Check
TX1093770 —UN—28JUN13
TX1086753 —UN—11JAN11
1— Engine Speed Dial
2— Auto-Idle Switch
3— Travel Speed Switch
4— Power Mode Switch
Fill the bucket with dirt.
Position machine on a hillside with a slope of approximately 25%. If a hill is not
available, raise one side of machine approximately 300 mm (1 ft.) with the boom and
then put a block under the track.
Move arm to the fully extended position. Raise boom so arm-to-bucket pivot pin is the
same height as boom-to-frame pivot pin.
Swing upperstructure clockwise so it is 90 degrees to the slope.
Turn engine speed dial (1) to H (fast idle) position.
Press power mode button (4) until H/P (high power) mode is displayed on monitor.
Actuate the swing function to swing uphill.
LOOK: Does upperstructure swing uphill?
Swing upperstructure 180 degrees counterclockwise and repeat procedure.
Turn engine speed dial to H (fast idle) position.
Power mode switch in H/P (high power) mode.
Actuate the swing function to swing uphill.
LOOK: Does upperstructure swing uphill?
Miscellaneous—Operational Checkout
Machine Position
PUSH
MODE
L
L
A/I
OFF
INT
ON
OFF
PUSH
1
2
3
4
5
5
6
7
8
9
0
4
Switch Panel
Continued on next page
4-2-27
PUSH
MENU/SET
PUSH
TUNE/AM-FM
PUSH
/VOL
/PWR
H
PUSH
VOL/PWR
-1
min
1
H
2
A/I
ON
OFF
3
MODE
OFF
1
2
YES: Go to next check.
NO: See your authorized
dealer.
CN93077,000003A -19-16MAY13-34/53
092221
PN=232

Advertisement

Table of Contents
loading

Table of Contents