Maintenance-Every 6000 Hours; Drain Cooling System - Worldwide Construction And Forestry Division 380GLC Operator's Manual

Table of Contents

Advertisement

Drain Cooling System

CAUTION: Prevent possible injury from hot
spraying fluids. Shut off engine. Remove filler
cap only when cool enough to touch with bare
hands. Slowly loosen cap to relieve pressure
before removing completely.
1. Check coolant hoses for cracks and leaks. Replace if
necessary.
2. Tighten clamps.
3. Check radiator, charge air, and oil cooler for dirt,
grease, leaks, and loose or broken mountings. Clean
radiator, charge air, and oil cooler fins.
4. Remove surge tank cap (1) to relieve pressure.
Specification
Cooling System—Capac-
ity.................................................................................................... 39.7 L
5. Remove cover from underside of machine to access
radiator drain valve (2).
NOTE: Drain waste into a container. Dispose
of waste properly.
6. Turn radiator drain valve counterclockwise to open.
Allow coolant to drain into a container. Dispose of
waste coolant properly.
7. Close radiator drain valve and replace cover.
8. Install surge tank cap.
1— Surge Tank Cap
Maintenance—Every 6000 Hours
10.5 gal.
2— Radiator Drain Valve
3-12-1
Service Cooling System Safely
Surge Tank Cap
Radiator Drain Valve
DB84312,00000EF -19-12MAR14-1/1
092221
PN=184

Advertisement

Table of Contents
loading

Table of Contents