Service Advisor™ Remote (Sar) Operation - Worldwide Construction And Forestry Division 380GLC Operator's Manual

Table of Contents

Advertisement

Service ADVISOR™ Remote (SAR) Operation
The flex power controller (FPC) will interface with
JDLink™ and the monitor to communicate the availability
of software updates and programming progress. The
Service ADVISOR™ Remote (SAR) switch (1) is wired
directly to the FPC and allows the operator to accept
or decline available updates. Alarm indicators on the
display are controlled through diagnostic trouble codes
(DTCs) originating from the FPC. The FPC will create
the DTCs under certain conditions, which will then
prompt the monitor to display operator instructions. It
will be necessary to interact with a John Deere dealer or
technician for needed information.
NOTE: The programming alarm indicator is used for
different purposes, but the color of the alarm
indicator changes for each purpose.
When a software update is available to install, a yellow
programming alarm will appear on the monitor, along with
a message stating:
SOFTWARE UPDATE READY
NOTE: Alarm List ONLY appears as a submenu if
there is an actual alarm.
The Alarm List submenu under the Main Menu will give
instructions to guide the operator through the process.
For viewing alarm instructions, see Main Menu—Alarm
List. (Section 2-2.)
Park machine and stop engine. Installation of the software
can only process if the engine is not running and pilot
shutoff lever is in locked (UP) position.
NOTE: Before installing software, make sure the
SOFTWARE TERMS AND CONDITIONS have
been read. Find SOFTWARE TERMS AND
CONDITIONS at the beginning of this manual.
LEDs on the SAR switch will illuminate when this alarm
appears. The left LED will be red and the right LED will
be green.
Press and hold the right side of SAR switch (green LED)
for 3 seconds to begin programming installation. Press left
side of SAR switch (red LED) to cancel software update
and wait until the next power cycle.
JDLink is a trademark of Deere & Company
Service ADVISOR is a trademark of Deere & Company
Operation—Operating the Machine
TX1087187 —UN—21JAN11
1— Service ADVISOR™
Remote (SAR) Switch
2— DECLINE Software Updates
If operator chooses to install the new update, the
programming alarm will remain on the monitor, but the
color will change to red and the message will state:
PROGRAMMING IN PROCESS
Green LED on SAR switch will blink while programming
is taking place.
DO NOT turn OFF machine power until the programming
is complete.
Once programming is completed, programming alarm will
turn green and the message will state:
PROGRAMMING COMPLETED
Cycle machine power to complete the installation process.
Continued on next page
2-3-11
Service ADVISOR™ Remote Switch
Programming Alarm
3— ACCEPT Software Updates
TX,SAR,OPERATION,1 -19-13JUL20-1/3
092221
PN=112

Advertisement

Table of Contents
loading

Table of Contents