Worldwide Construction And Forestry Division 380GLC Operator's Manual page 231

Table of Contents

Advertisement

Swing Park Brake and
Circuit Drift Check
TX1093770 —UN—28JUN13
Fill the bucket with dirt.
Position machine on a hillside with a slope of approximately 25%. If a hill is not
available, raise one side of machine approximately 300 mm (1 ft) with the boom and
then put a block under the track.
Move arm to the fully extended position.
Raise boom so arm-to-bucket pivot pin are the same height as boom-to-frame pivot pin.
Position upperstructure with cab over travel motors, perpendicular to tracks.
Turn engine speed dial to L (slow idle) position.
Wait approximately 5 minutes with all functions in neutral.
NOTE: Function does not need to be fully actuated to disengage the swing park brake.
Slowly actuate bucket load function to disengage the swing park brake. Do not hold
the function over relief for more than 10 seconds.
LOOK: Does upperstructure hold position when swing park brake is engaged?
LOOK: Does upperstructure move only slightly when swing park brake is disengaged?
Swing upperstructure 180 degrees counterclockwise and repeat procedure.
Turn engine speed dial to L (slow idle) position.
Wait approximately 5 minutes with all functions in neutral.
Slowly actuate bucket load function to disengage the swing park brake. Do not hold
the function over relief for more than 10 seconds.
LOOK: Does upperstructure hold position when swing park brake is engaged?
LOOK: Does upperstructure move only slightly when swing park brake is disengaged? NO: See your authorized
Miscellaneous—Operational Checkout
Machine Position
Continued on next page
4-2-26
YES: Go to next check.
dealer.
CN93077,000003A -19-16MAY13-33/53
092221
PN=231

Advertisement

Table of Contents
loading

Table of Contents