1. Attach chains or cables to the four lifting points (A) on
the lift sling (MD #163871), and connect the loop ends
to the crane hook.
IMPORTANT:
Use cables or chains with a minimum lifting capacity of
3221 kg (7100 lb.).
2. Attach the lift sling to the four designated lifting points
on the windrower shipping frame as shown.
DANGER
To avoid injury or death from a swinging or falling load,
keep all bystanders clear when lifting. Equipment used
for lifting must exceed the maximum requirements
specified in this section.
3. Lift the windrower onto the support stand (A).
4. Remove chains from shipping frame and move lift
sling (B) clear of the work area.
214298
ASSEMBLING THE WINDROWER
Figure 3.4: Shipping Frame Lifting Points
Figure 3.5: Windrower on Support Stand
29
Revision A