MacDon M155 Unloading And Assembly Instructions page 101

Self-propelled windrower
Table of Contents

Advertisement

3. Activate the REEL UP switch (A) on the GSL to raise
the center-link until the hook is above the attachment
pin on the header.
IMPORTANT:
If the center-link is too low, it may contact the header as
the windrower approaches the header for hookup.
4. Drive the windrower slowly forward until the boots (A)
enter the header legs (B). Continue driving slowly
forward until lift linkages contact the support plates in
the header legs and the header nudges forward.
5. Ensure the lift linkages are properly engaged in the
header legs and are contacting the support plates.
6. Use the following GSL functions to position the
center-link hook above the header attachment pin:
REEL UP (A) to raise the center-link
REEL DOWN (B) to lower the center-link
HEADER TILT UP (C) to retract the center-link
HEADER TILT DOWN (D) to extend the center-link
214298
ASSEMBLING THE WINDROWER
Figure 3.131: Ground Speed Lever
Figure 3.132: Header Leg and Boot
Figure 3.133: Ground Speed Lever
89
Revision A

Advertisement

Table of Contents
loading

This manual is also suitable for:

M205M155e4 2017

Table of Contents