MacDon M155 Unloading And Assembly Instructions page 21

Self-propelled windrower
Table of Contents

Advertisement

1. Attach chains or cables to the four lifting points on the
lift sling (MD #163871), and connect the loop ends to
the crane hook.
IMPORTANT:
Use cables or chains with a minimum lifting capacity of
3221 kg (7100 lb.).
2. Attach lift sling (MD #163871) to the four designated
lifting points on the windrower shipping frame.
DANGER
To avoid injury or death from a swinging or falling load,
keep all bystanders clear when lifting. Equipment used
for lifting must exceed the maximum requirements
specified in this section.
3. Lift the windrower off the platform and move to the
setup area.
214298
UNLOADING THE WINDROWER
Figure 2.3: Lift Sling
A - 1500 mm (59 in.) Minimum
Figure 2.4: Shipping Frame Lifting Points
9
B - 2120 mm (83.5 in.) Typical
Revision A

Advertisement

Table of Contents
loading

This manual is also suitable for:

M205M155e4 2017

Table of Contents