Figure 109: Disconnecting The Ac Power Cord From The Chassis; Figure 110: Lifting The Locking Handle On The Sbxpwrsys2 Ac Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

2. Move the retaining clip from the appropriate power cord on the rear
panel of the chassis, and disconnect the cord. Refer to Figure 109.
Figure 109. Disconnecting the AC Power Cord from the Chassis
3. Lift the locking hand on the power supply. Refer to Figure 110.
Figure 110. Lifting the Locking Handle on the SBxPWRSYS2 AC Power
4. Carefully pull on the locking handle to slide the power supply from the
chassis. Refer to Figure 111 on page 190.
SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Supply
189

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents