Figure 64: Aligning The Blank Power Supply Cover In The Slot; Figure 65: Lowering The Locking Handle On The Blank Power Supply Slot Cover - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 4: Installing the Chassis
Figure 64. Aligning the Blank Power Supply Cover in the Slot
3. Lower the locking handle on the blank power supply slot cover to
secure the cover in the chassis. Refer to Figure 65.
Figure 65. Lowering the Locking Handle on the Blank Power Supply Slot
Cover
4. Go to "Installing the Power Cord Retaining Clips" on page 117.
116

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents