Figure 49: Sliding The Sbxpwrsys2 Ac Power Supply Into The Chassis; Figure 50: Lowering The Locking Handle On The Sbxpwrsys2 Ac Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Figure 49. Sliding the SBxPWRSYS2 AC Power Supply into the Chassis
5. Gently press on the faceplate of the power supply to seat the unit on
the connector on the backplane of the chassis, and lower the locking
handle to secure the unit in the chassis. Refer to Figure 50.
Figure 50. Lowering the Locking Handle on the SBxPWRSYS2 AC Power
Supply
103

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents