Figure 116: Reinstalling The Screws On The Positive And Negative Terminals - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Figure 116. Reinstalling the Screws on the Positive and Negative
8. Slide the plastic cover to the left and lightly tighten the two screws to
secure it in place. Refer to Figure 117 on page 196.
Caution
Do not over tighten the screws or you might crack or break the
plastic cover.
The plastic cover might not be present if the lead wires were
connected to the terminal block with the right angle terminals. If this is
the case, you may either skip this step or reinstall the plastic cover on
the power supply.
SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Terminals
195

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents