Figure 118: Removing The Grounding Wire - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Figure 118. Removing the Grounding Wire
10. Reinstall the nut and washer on the grounding post. Refer to Figure
119 on page 198.
197

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents