Tools And Material - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 4: Installing the Chassis

Tools and Material

92
You need to provide the following tools and material to install the chassis:
#2 Phillips-head screwdriver
Eight screws for a standard 19-inch equipment rack
10 AWG stranded grounding wire
Wire insulation stripper
Crimping tool

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents