Figure 76: Attaching The Bare Grounding Wire To The Grounding Post - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Figure 76. Attaching the Bare Grounding Wire to the Grounding Post
5. Secure the wire with the nut and washer removed in step 2, and an 8
mm wrench, as shown in Figure 77 on page 130.
Allied Telesis recommends tightening the nut and washer to 26 inch-
lbs.