Figure 55: Lowering The Locking Handle On The Sbxpwrsys1-80 Dc Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 4: Installing the Chassis
108
Figure 55. Lowering the Locking Handle on the SBxPWRSYS1-80 DC
8. Visually inspect the power supply to be sure that its faceplate is flush
against the front panel of the chassis and the locking handle is fully
down.
Note
Do not tighten the handle locking screw yet. You may need to
slightly lift the handle to move the plastic guard panel when you
connect the positive and negative wires.
9. If necessary, repeat this procedure to install a second power supply.
10. After installing the power supplies, go to "Installing Ethernet Line
Cards" on page 109.
Power Supply

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents