Figure 119: Reinstalling The Nut And Washer On The Grounding Post - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 8: Replacing Modules
Figure 119. Reinstalling the Nut and Washer on the Grounding Post
Note
If you did not perform step 3 to loosen the retaining screw on the
power supply, perform the step before continuing.
11. Lift the locking handle and slide the power supply from the chassis.
Refer to Figure 120 on page 199.
Warning
The power supply is heavy. Use both hands to hold the module as
you remove it from the chassis.
198

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents