Chapter 5: Wiring the SBxPWRSYS1-80 DC Power Supply
144
Figure 92. Tightening the Handle Locking Screw
9. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
10. Connect the power wires to the circuit breaker.
11. If you have two SBxPWRSYS1-80 Power Supplies for the switch,
repeat this procedure to install the second power supply.
12. Repeat the procedures in this chapter to wire the DC connectors on
the SBxPWRSYS1-80 DC Power Supplies on other switches for the
stack.
13. Go to "Configuring the Master Switch" on page 160 or "Configuring
Member Switches" on page 166.