Figure 33: Pre-Installed Items On The Front And Side Panels - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

1
1. Two equipment rack
brackets
3. Visually inspect the front panel of the switch for the pre-installed
components shown in Figure 33.
2
2. Seven line card slot
covers
4. One management panel
(Not field replaceable.)
Figure 33. Pre-installed Items on the Front and Side Panels
4. Visually inspect the rear panel for the pre-installed components shown
in Figure 34 on page 86.
SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
3
3. One blank panel in power
supply slot B
4
1
85

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents