Figure 51: On/Off Switch On The Sbxpwrsys1-80 Dc Power Supply; Figure 52: Loosening The Handle Locking Screw On The Sbxpwrsys1-80 Dc Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 4: Installing the Chassis
106
Figure 51. On/Off Switch on the SBxPWRSYS1-80 DC Power Supply
4. With a #2 Phillips-head screwdriver, loosen the handle locking screw
on the power supply, as shown in Figure 52.
Figure 52. Loosening the Handle locking Screw on the SBxPWRSYS1-80
5. Lift the handle on the SBxPWRSYS1-80 DC Power Supply. Refer to
Figure 53 on page 107.
DC Power Supply
On/Off
Switch

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents