Figure 106: Installing Sp10Tw Cables In The Xem2-12Xs Line Card; Figure 107: Sliding The Qsfpcu Cable Into The Port - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 7: Cabling XEM2 Line Card Ports
Release Tab
184
Figure 106. Installing SP10TW Cables in the XEM2-12XS Line Card
XEM2-4QS Line Card - Orient the connector on the QSFPCU
Cable with the release tab on the left side and slide it into the port
until it clicks into place. Refer to Figure 107.
Figure 107. Sliding the QSFPCU Cable into the Port
5. Connect the other end of the cable into a compatible port on another
network device.
Release Tab