Figure 46: Installing The Grounding Lug And Wire - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 4: Installing the Chassis
100
Figure 46. Installing the Grounding Lug and Wire
5. Connect the other end of the grounding wire to the building protective
earth.
6. Go to "Installing SBxPWRSYS2 AC Power Supplies" on page 101 or
"Installing SBxPWRSYS1-80 DC Power Supplies" on page 105.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents