Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Allied Telesis Manuals
Switch
SwitchBlade x908 GEN2
Installation manual
Figure 44: Removing The Grounding Lug From The Chassis; Figure 45: Attaching The Grounding Wire To The Grounding Lug - Allied Telesis SwitchBlade x908 GEN2 Installation Manual
Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs
Also See for SwitchBlade x908 GEN2
:
Installation manual
(186 pages)
1
2
3
4
Table Of Contents
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
page
of
230
Go
/
230
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Advertisement
Figure 44. Removing the Grounding Lug from the Chassis
3. Insert one end of the grounding wire into the grounding lug, as shown
in Figure 45, and use a crimping tool to secure the wire to the
grounding lug.
Figure 45. Attaching the Grounding Wire to the Grounding Lug
4. Install the grounding lug on the rear panel of the chassis. Refer to
Figure 46 on page 100.
SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
99
Table of
Contents
Previous
Page
Next
Page
1
...
96
97
98
99
100
101
102
103
Advertisement
Table of Contents
Related Manuals for Allied Telesis SwitchBlade x908 GEN2
Switch Allied Telesis SwitchBlade x908 GEN2 Installation Manual
Stand-alone switches (186 pages)
Switch Allied Telesis SBx908 GEN2 Command Reference Manual
High capacity stackable layer 3+ modular switch reference for alliedware plus version 5.4.7b-1.x (3118 pages)
Switch Allied Telesis x900-24 series Function Manual
Configuring hardware filters (18 pages)
Switch Allied Telesis x900-48 series Function Manual
Configuring qos (21 pages)
Switch Allied Telesis x900-48FE Hardware Reference Manual
X900 series switch and switchblade x908 (65 pages)
Switch Allied Telesis SwitchBlade x908 Series Software Reference Manual
Switchblade x908/x900 series alliedware plus operating system software reference for version 5.3.1 (1854 pages)
Switch Allied Telesis AlliedWare Plus Overview
Overview of quality of service features (40 pages)
Switch Allied Telesis AT X900-12XT/S How To Configure
Alliedware plus os hardware filters (21 pages)
Switch Allied Telesis x900-12X Series Datasheet
X900-12x and 24x series advanced gigabit layer 3+ expandable switches (11 pages)
Switch Allied Telesis AT-8600 How To Configure
Virtual router redundancy protocol (9 pages)
Switch Allied Telesis x900 Series Installation Manual
Removable power supply and fan (13 pages)
Switch Allied Telesis AT-x930-28GTX Installation Manual
X930 series gigabit layer 3 ethernet switches for vcstack (188 pages)
Switch Allied Telesis AlliedWare Plus Installation Manual
Gigabit layer 3 ethernet switches (214 pages)
Switch Allied Telesis x950 Series Installation Manual
Stand-alone switches (176 pages)
Switch Allied Telesis x950 Series Installation Manual
Advanced layer 3+, alliedware plus v5.5.0-1 (280 pages)
Switch Allied Telesis x950-52XTQm Installation Manual
Standalone switches, advanced layer 3+ alliedware plus (230 pages)
Related Content for Allied Telesis SwitchBlade x908 GEN2
SwitchBlade x908 GEN2 Figure 30: Removing The Grounding Lug From The Chassis
Allied Telesis SwitchBlade x908 GEN2
AT-SBx908 Figure 37: Removing The Grounding Lug From The Chassis
Allied Telesis AT-SBx908
AT-SB*908 GEN2 Figure 37: Removing The Grounding Lug From The Chassis
Allied Telesis AT-SB*908 GEN2
AT-SBx908 Gen2 Figure 24: Removing The Grounding Lug From The Chassis
Allied Telesis AT-SBx908 Gen2
SwitchBlade x3112 Figure 44: Removing The Grounding Lug
Allied Telesis SwitchBlade x3112
SwitchBladex8112 Figure 42: Removing The Grounding Lug
Allied Telesis SwitchBladex8112
SwitchBlade x3106 Figure 46: Removing The Grounding Lug
Allied Telesis SwitchBlade x3106
AT-IE510-28GSX Figure 24: Attaching The Stranded Grounding Wire To The Ring Lug
Allied Telesis AT-IE510-28GSX
AT-x510-28GTX Figure 30: Attaching The Stranded Grounding Wire To The Ring Lug
Allied Telesis AT-x510-28GTX
AT-x510-28GPX Figure 35: Attaching The Stranded Grounding Wire To The Ring Lug
Allied Telesis AT-x510-28GPX
x330-52GTX Chapter 2: Virtual Chassis Stacking
Allied Telesis x330-52GTX
x950-52XTQm Connecting The Grounding Wire
Allied Telesis x950-52XTQm
CentreCOM GS970EMX/52 Chapter 2: Virtual Chassis Stacking
Allied Telesis CentreCOM GS970EMX/52
x530 Series Chapter 2: Virtual Chassis Stacking
Allied Telesis x530 Series
IE200 Series Figure 12: Removing The Dust Plug From An Sfp Slot
Allied Telesis IE200 Series
AT-8900 Inserting And Removing A Cflash Card
Allied Telesis AT-8900
This manual is also suitable for:
Sbx908 gen2
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL