Figure 47: Removing The Blank Power Supply Panel From Power Supply Slot B; Figure 48: Lifting The Locking Handle On The Sbxpwrsys2 Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 4: Installing the Chassis
102
Figure 47. Removing the Blank Power Supply Panel from Power Supply
3. Lift the handle on the SBxPWRSYS2 AC Power Supply. Refer to
Figure 48.
Figure 48. Lifting the Locking Handle on the SBxPWRSYS2 Power Supply
4. Carefully align the power supply in the slot and slide it into the slot until
it makes contact with the connector inside the chassis. Refer to Figure
49 on page 103.
Slot B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents