Figure 53: Lifting The Locking Handle On The Sbxpwrsys1-80 Dc Power Supply; Figure 54: Inserting The Sbxpwrsys1-80 Dc Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Figure 53. Lifting the Locking Handle on the SBxPWRSYS1-80 DC Power
6. Carefully align the power supply in the slot and slide it into the slot until
it makes contact with the connector inside the chassis. Refer to
Figure 54.
Figure 54. Inserting the SBxPWRSYS1-80 DC Power Supply
7. Gently press on the faceplate of the power supply to seat the unit on
the connector on the backplane of the chassis, and lower the locking
handle to secure the unit in the chassis. Refer to Figure 55 on page
108.
SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Supply
107

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents