Figure 34: Pre-Installed Items On The Rear Panel - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 3: Beginning the Installation
1. One ground wire lug
86
2
1
Figure 34. Pre-installed Items on the Rear Panel
Note
You should retain the original packaging material in the event you
need to return the unit to Allied Telesis.
Note
The product does not come with power supplies. Power supplies
must be ordered separately.
5. Remove the accessory kit from the shipping box and verify its
components, listed in Figure 35 on page 87.
2
2. Two AT-FAN08 Fan
Modules

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents