Unpacking Sbxpwrsys2 Ac Power Supplies; Figure 36: Items In The Shipping Box For The Sbxpwrsys2 Ac Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 3: Beginning the Installation

Unpacking SBxPWRSYS2 AC Power Supplies

88
The SBxPWRSYS2 AC Power Supply shipping box should include the
items in Figure 36.
Figure 36. Items in the Shipping Box for the SBxPWRSYS2 AC Power
The tie wrap included with the power supply is not used with the SBx908
Gen2 chassis.
If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
After unpacking the chassis and power supplies, go to Chapter 4,
"Installing the Chassis" on page 91.
One SBxPWRSYS2 Power
Supply
One regional AC power
supply cord
One tie wrap
Supply

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents